Nutana 48" Mineveyors (Bridge Conveyors) were developed for 1200 TPH Potash continuous mining. Many systems are in use configured as five and seven bridge systems. The most recent ten bridge system delivered in 2016 extends to about 500 feet in length.
Extensive computer 3D modeling and FEA (Finite Element Analysis) was done to guarantee long trouble free operation.
Some systems have a crusher installed on the discharge bridge.
A Rotating Axle was developed for added mining depth for the five bridge systems.
Shop mock up and testing of cable handling system.
Drive axle bolt on sub assembly.
Four wheel drive discharge bridge erection underground