Computer 3D modeling is used extensively in the execution of our projects. This and the next photo is a model of our Potash Mineveyors.
Systems up to 10 bridges long and extending close to 500 feet.
Machine for machining plastic pipe transitions
Plastic pipe welding alignment clamps
Potash Generator Skid. Extensive computer modeling and FEA (Finite Element Analysis) was done to minimize deflections of the motor mounts and prevent resulting damage.
Certified lift beams to enable lifting the equipment as a one unit.
Complete shop trial assembly and installation of fire suppression equipment
The completed unit underground